Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-graphql domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114 Warning: Undefined array key "HTTP_ORIGIN" in /var/www/html/wp-content/plugins/wp-cors/wp-cors.php on line 29 Procurement – MMS Engineering
Categories
projects

MINE DRY CONVERSION TO KITCHEN

Project description: Performed all electrical installations, ICT system installation, indoor & outdoor installation for the Oyu Tolgoi site  kitchen ‘’Mazaalai’’ which is the Mongolian biggest kitchen with a capacity of 2000 people.

Categories
projects

MMS GREEN BUILDING PROJECT

Project description: Mongolia’s Landmark LEED-Certified Green Building Initiative, Encompassing Offices, Warehouses, and Repair Centers Spanning 4,800 m²

.

Categories
projects

CONVEYOR PROJECT

MMSE, have been successfully implementing the Conveyor Belt Maintenance & Service project at OT concentrate since July, 2015. The conveyor, which is considered as the longest and biggest in Mongolia with overall length of 7km..

Categories
projects

PERMANENT POWER SUPPLY FOR THE AIRPORT

Project description: 47000m, 35kV overhead line installation, concrete pole installation, and permanent power supply to the Khanbumbat airport. The airport facilities’ power supply was temporary, provided by 2 diesel generator sets operating in parallel

.