Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-graphql domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114 Warning: Undefined array key "HTTP_ORIGIN" in /var/www/html/wp-content/plugins/wp-cors/wp-cors.php on line 29 PERMANENT POWER SUPPLY FOR THE AIRPORT – MMS Engineering
Categories
projects

PERMANENT POWER SUPPLY FOR THE AIRPORT

Project description: 47000m, 35kV overhead line installation, concrete pole installation, and permanent power supply to the Khanbumbat airport. The airport facilities’ power supply was temporary, provided by 2 diesel generator sets operating in parallel

.