Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-graphql domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114 Warning: Undefined array key "HTTP_ORIGIN" in /var/www/html/wp-content/plugins/wp-cors/wp-cors.php on line 29 October 2023 – MMS Engineering
Categories
projects

SOLAR PANEL SYSTEM AT OTMINE EXPLOSIVE MAGAZINE

Each of 75 solar panel has power of 605W and total power of 45,3kW. The panels are made by bifacial module with dual glass technology which enables it to gather light energy from  it’s both sides.

Categories
iso_images

ISO 4

Categories
iso_images

ISO 3

Categories
iso_images

ISO 2

Categories
iso_images

ISO 1

Categories
projects

SHAFT #4

Responsible for repair services at Shaft #4 and Shaft #3 area 0.3-15kV electrical works.

Categories
projects

TAILINGS STORAGE FACILITY SUPPORTING INFRASTRUCTURE – DTR TOWERS

Project description: DTR Tower,  steel towers, OHL conductor, DTR technical room / panel, lighting materials, sockets, switch and receptacles /  Grounding works, IT communication works

Categories
projects

SOCCER FIELD MAINTENANCE AND LIGHT INSTALLATION

Project description: Install concrete, Install shock pad, Coat glue & trim grass turf, Assembly of steel structure, Install of portable ladder, Install handrail, Install of WPC follow sheets, Painting, Cable pulling, Install lighting tower foundation, Install obstruction light, Install cable termination, Install lighting tower, install panel