Project description: Mongolia’s Landmark LEED-Certified Green Building Initiative, Encompassing Offices, Warehouses, and Repair Centers Spanning 4,800 m²
.
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-graphql
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114
Warning: Undefined array key "HTTP_ORIGIN" in /var/www/html/wp-content/plugins/wp-cors/wp-cors.php on line 29
Project description: Mongolia’s Landmark LEED-Certified Green Building Initiative, Encompassing Offices, Warehouses, and Repair Centers Spanning 4,800 m²
.
MMSE, have been successfully implementing the Conveyor Belt Maintenance & Service project at OT concentrate since July, 2015. The conveyor, which is considered as the longest and biggest in Mongolia with overall length of 7km..
Project description: 47000m, 35kV overhead line installation, concrete pole installation, and permanent power supply to the Khanbumbat airport. The airport facilities’ power supply was temporary, provided by 2 diesel generator sets operating in parallel
.
Project description: Performed power supply and automation system drawing and installation including power and instrument cable installation, cable management system, e-room, emergency stop, distribution board of the biggest quarry crushing plant in Mongolia.
.